Mexico Type 70 Combination Aluminum Alloy Flood Control Board

Material for the barrier and fixed columns: aluminum alloy 6063-T6; Waterproof sealing strip: EPDM; Embedded parts: stainless steel

Product Description

Product Material

Material for the barrier and fixed columns: aluminum alloy 6063-T6; Waterproof sealing strip: EPDM; Embedded parts: stainless steel

Specifications

Board thickness: 70mm

Single board height: 200mm

Board wall thickness: 2.5mm

Maximum water blocking height: 2000mm

Column spacing: 6000mm

Application Range

Suitable for flood control at urban street underground passages, buildings, and can also be used for heightening hard dam embankments to prevent overflow.

Features of aluminum alloy flood control board

1. Beautiful appearance, strong structure, lightweight, quick installation, and strong waterproof performance.

2. After installation, it integrates with the surrounding environment, presenting a stylish and generous appearance.

3. Strong structure capable of resisting water pressure and impact effectively.

4. Convenient and quick to install and dismantle, with easy-to-operate rapid tensioning devices.

5. Made of aluminum alloy, easy to maintain and corrosion-resistant. As flood control gates are standby equipment, they require minimal maintenance and can be stacked for storage.

6. The sides of the columns are equipped with winged side waterproof strips, utilizing the natural dynamic pressure of floodwater for better sealing as water volume increases.

Installation Notes

According to the weather forecast from the China Meteorological Administration, assemble the mobile flood control wall before the flood season. The number of personnel can be adjusted according to the workload, typically requiring 2-4 people to complete.

1. After installing the intermediate columns, pour cement mortar, and cure for more than 72 hours before normal use.

2. Ensure the frame is securely fixed to the wall.

3. Perform waterproof treatment between the door frame and the wall according to the drawings.

4. Before installing the flood control wall, it must be inspected. If there is any surface damage or deformation due to transportation or storage mishandling, it should be repaired before installation.

5. Ensure smooth installation and removal of the barriers, and smooth tightening of screws.

6. After installation, test and commission its operation to ensure waterproof effectiveness and flexibility.

Good Quality, Attention to Details

1. The surface of the water barrier and door cover is natural oxide, which is elegant and generous. The perimeter is designed with rounded corners for humanized convenience, making it easy to cross over and less prone to scratches.

2. The sealing strips for the door panels and columns are produced using German technology. The factory products used for high-speed train matching inspection adopt European and American standards.

3. The top pressing and side pressing devices ensure the segmented water blocking and overall sealing performance of the water blocking system.